Choose the article that matches the uncertainty in the current request, then carry its questions into the same project record. A condition problem may call for the documentation article first; a finish request may need the painting scope guide; a turnover discussion may benefit from the tenant-improvement or white-box guide. The topic changes, but the review discipline stays consistent.
Do not treat an article title as the scope itself. Use the prompts to identify the location, current condition, intended result, reference material, access limits, dependencies, and open decisions that apply to the individual space. Those details should be written in project-specific language before they appear as inclusions, exclusions, assumptions, or alternates in a proposal.
When several articles apply, keep their categories distinct inside one review packet. A white-box condition question can sit beside painting, low-voltage, or tenant-improvement notes without merging responsibility or suggesting every discussed item is confirmed work. Separate headings and status labels let the project record show the relationship while preserving each boundary.
Return to the proposal-boundary article before the review is considered ready. It provides a final check that the written scope matches the available condition evidence, unresolved questions remain visible, and related work has not moved into the base request through shorthand. The result is a more usable handoff, not a longer document for its own sake.